Project management · Lesson 3 of 9
Scope and the work breakdown structure
Scope is the boundary of the work: what the project will deliver and, just as importantly, what it will not. This lesson takes requirements into a scope statement, breaks the work into a work breakdown structure of work packages, applies the 100% rule, and shows how change control keeps scope creep in check.
This lesson is complete in writing. A video for it is on its way.
What you will learn
- By the end you can turn a list of requirements into a scope statement with clear exclusions.
- You can build a work breakdown structure and explain the 100% rule.
- You can define a work package and say what makes one usable.
- You can recognise scope creep and explain why it is dangerous.
- You can describe a change control process from request to updated plan.
Key terms in this lesson
- Scope statement
- A written description of what a project will deliver, the boundaries of the work, the main deliverables, the acceptance criteria and the things explicitly excluded.
- Work breakdown structure
- A hierarchical decomposition of all the work of a project into smaller pieces, ending in work packages that can be estimated, assigned and tracked.
- Work package
- The lowest level of a work breakdown structure: a defined piece of work that one person or team can own, estimate, schedule and report on.
- Scope creep
- The gradual, uncontrolled growth of a project's scope through small additions that are never formally approved, costed or given extra time.
- Change control
- The formal process by which a proposed change to a project's scope, schedule or budget is recorded, assessed for impact, approved or rejected, and then built into the plan.
- Step 1: From requirements to a scope statement, not started
- Step 2: The work breakdown structure and the 100% rule, not started
- Step 3: A worked WBS: the Delta Engineering office move, not started
- Step 4: Scope creep: how projects grow in the dark, not started
- Step 5: Change control: how a change becomes part of the plan, not started
About 10 min of reading
Step 1 of 5
From requirements to a scope statement
Opening this step…
Step 2 of 5
The work breakdown structure and the 100% rule
This step opens when you finish the one above.
Step 3 of 5
A worked WBS: the Delta Engineering office move
This step opens when you finish the one above.
Step 4 of 5
Scope creep: how projects grow in the dark
This step opens when you finish the one above.
Step 5 of 5
Change control: how a change becomes part of the plan
This step opens when you finish the one above.
Key takeaways
The key takeaways open when you finish every step.
Lesson quiz
5 questions. You need 85% to pass.
The quiz opens when you finish every step.