Process design and capacity planning
A process is the sequence of steps that turns inputs into outputs, and its design decides how fast, how flexibly and how cheaply an operation can run. This lesson covers the five process types and their service equivalents, process mapping, bottlenecks and throughput, the main capacity measures, and the level, chase and demand-management strategies for matching capacity to demand.
This lesson is complete in writing. A video for it is on its way.
What you will learn
- By the end you can name the five process types, their service equivalents, and the volume and variety each suits.
- You can draw a simple process map and use it to find queues, repeats and hand-offs.
- You can find the bottleneck of a process and work out its throughput and the utilisation of every other step.
- You can calculate capacity utilisation and efficiency, and choose between level, chase and demand-management strategies.
Key terms in this lesson
- Process mapping
- Drawing every step, decision, queue and hand-off in a process in sequence so that delays, repeats and waste become visible and can be redesigned.
- Bottleneck
- The step in a process with the lowest capacity, which sets the output rate of the whole process no matter how fast the other steps can work.
- Throughput
- The rate at which a process completes units of output over a period, limited by its bottleneck and measured in units per hour, day or week.
- Capacity
- The maximum level of output an operation or process can achieve in a period under normal working conditions, given its people, equipment and time.
- Capacity utilisation
- Actual output divided by capacity for the same period, expressed as a percentage, showing how much of an operation's potential output is being used.
- Step 1: Five process types, not started
- Step 2: Process mapping, not started
- Step 3: Bottlenecks and throughput, not started
- Step 4: Measuring capacity, not started
- Step 5: Matching capacity to demand, not started
- Step 6: Long-term capacity decisions, not started
About 12 min of reading
Step 1 of 6
Five process types
Opening this step…
Step 2 of 6
Process mapping
This step opens when you finish the one above.
Step 3 of 6
Bottlenecks and throughput
This step opens when you finish the one above.
Step 4 of 6
Measuring capacity
This step opens when you finish the one above.
Step 5 of 6
Matching capacity to demand
This step opens when you finish the one above.
Step 6 of 6
Long-term capacity decisions
This step opens when you finish the one above.
Key takeaways
The key takeaways open when you finish every step.
Lesson quiz
6 questions. You need 85% to pass.
The quiz opens when you finish every step.