Semi-variable cost

Also called semi-variable costs, mixed cost, semi-fixed cost

In short

A cost with a fixed part paid whatever the level of activity and a variable part that rises with activity, such as a phone bill with a line rental and call charges.

  • Intermediate
  • Concept
  • Checked

In detail

Many real costs are neither purely fixed nor purely variable. An electricity bill may carry a standing charge plus a charge per unit used. A sales team may be paid a base salary plus commission. Vehicle costs include insurance, which is fixed, and fuel, which varies with distance. These are semi-variable, or mixed, costs.

For planning and break-even analysis, managers split them into the two parts. The fixed element joins other fixed costs; the variable element is expressed per unit of activity and joins variable costs. Common ways to split them are the high-low method, which uses the highest and lowest activity levels, scatter graphs, and regression analysis, which fits a line through all the observations.

The split is an approximation that holds only within a relevant range of activity. Outside it, the fixed part may step up, for example when a second machine is needed, or the variable rate may change through bulk discounts.

Formula

Total cost = Fixed element + Variable cost per unit × Activity

Fixed element
the cost incurred at zero activity
Variable cost per unit
the extra cost of each unit of activity
Activity
units, hours or other measure of volume

Worked example

A delivery van costs 600 a month in insurance and lease plus 0.40 per kilometre in fuel and tyres. In March it travels 3,000 kilometres.

  1. Variable part: 0.40 × 3,000 = 1,200
  2. Total cost: 600 + 1,200 = 1,800

March's van cost is 1,800, of which 600 is fixed.

In practice

Budget holders use the split to prepare flexible budgets, so that a month with more activity is judged against a correspondingly higher cost allowance.

Watch out

  • A semi-variable cost is different from a stepped fixed cost, which jumps at thresholds but is flat between them.
  • The fixed and variable parts are estimates and drift over time.

Learn it properly

Official sources

Facts last checked on 3 November 2026.

Education, not advice: the Stockertim Dictionary explains what terms mean. It never recommends buying or selling anything.