Cut-over

Also called cutover, go-live, cut over

In short

The planned, rehearsed sequence of tasks that moves an organisation from the old system to the new one, from the data freeze to opening the new system to users.

  • Advanced
  • Process
  • Checked

In detail

Cut-over is the short, intense period in which an organisation stops using one system and starts using another. A detailed plan lists every task, often hundreds, with its owner, start time, duration and dependencies: freezing changes in the old system, extracting and loading final data, reconciling it, switching integrations, granting user access, checking that key processes work and finally opening the system.

The plan includes go and no-go checkpoints. At each, named leaders confirm that the criteria have been met, such as reconciled data, a passed parallel payroll and trained users, before the next stage begins. A rollback plan sets out how to return to the old system if a serious problem appears, and the point after which rollback is no longer possible.

Timing matters for HR and payroll. Cut-over is usually scheduled just after a payroll has been paid and well before the next cut-off, avoiding year-end and peak periods. It is rehearsed in the final mock conversion, and the period straight after go-live, often called hypercare, has extra support on hand to fix problems quickly.

In practice

A payroll cut-over begins on Friday evening after the last old-system payroll, with data frozen, loaded and reconciled over the weekend, a go decision at noon on Sunday and the new system open on Monday.

Watch out

  • A cut-over without a tested rollback plan leaves no safe way back.
  • Do not schedule cut-over close to a payroll deadline or year-end.