Acceptance criteria

Also called acceptance criterion, conditions of acceptance

In short

The specific, testable conditions a requirement or deliverable must meet before the business agrees it has been delivered.

  • Beginner
  • Concept
  • Checked

In detail

Acceptance criteria define done. For a user story about reporting a repair online, they might state that the tenant can choose the type of repair from a list, attach a photo, receive a reference number on screen and get an email confirmation. If any of these does not work, the story is not finished, however much effort has gone into it.

Good criteria are written before work starts, agreed with the person who will accept the work, and phrased so that a test can show a clear pass or fail. Some teams use a given-when-then pattern: given a particular situation, when the user does something, then a specific result follows. This makes it easy to turn criteria into test cases.

Criteria protect both sides. The business knows what it will get, and the team knows when it can stop. They also reduce argument at the end of a project, because acceptance is a matter of checking evidence against what was agreed rather than of opinion.

In practice

Testers build test cases from acceptance criteria, and product owners or sponsors check them during reviews before accepting a story or deliverable.

Watch out

  • Criteria that describe how something is built, rather than what it must do, limit design.
  • Adding new criteria after work starts is a change to scope, not a clarification.