Takt time

Also called takt

In short

Takt time is the available working time in a period divided by customer demand in that period, giving the pace at which one unit must be finished to keep up with demand.

  • Intermediate
  • Ratio or metric
  • Checked

In detail

Takt time sets the heartbeat of a process. If a factory works 450 minutes a day and customers want 90 units a day, one unit must be finished every 5 minutes. Each step in the process is then designed and staffed so that its work per unit fits within that rhythm. The word comes from the German for a beat or measure in music.

Comparing takt time with cycle time, the actual time each step takes per unit, shows where the process can and cannot keep up. Steps slower than takt time are bottlenecks needing more capacity, better methods or extra people; steps much faster than takt time may be overstaffed or may tempt overproduction. Balancing work across steps so that each is close to takt time produces smooth flow.

Takt time changes when demand or working hours change, so lean operations review it regularly. It applies to services too: a contact centre can divide available minutes by expected calls to see how quickly each must be handled, and a clinic can divide session time by expected patients.

Formula

Takt time = available working time / customer demand

available working time
time available for production in the period, after breaks
customer demand
units customers require in the same period

Worked example

A sandwich kitchen, Greenleaf, runs a 7.5-hour shift with 30 minutes of breaks and must make 840 sandwiches.

  1. Available time: 7.5 × 60 − 30 = 420 minutes
  2. Takt time in seconds: 420 × 60 / 840 = 30

Greenleaf must complete one sandwich every 30 seconds to meet demand.

In practice

Lean manufacturers display takt time on the line and balance stations against it, and service operations use the same idea to plan staffing against demand.

Watch out

  • Takt time is set by demand, not by how fast the process can work.
  • Using takt time with a highly variable product mix needs care.