Run sheet

Also called running order, run of show, event running order, run-sheet

In short

A run sheet is a timed, minute-by-minute script for an event day that lists what happens, where, who is responsible and what to do if a moment slips.

  • Beginner
  • Document
  • Checked

In detail

A run sheet is the working document for the day itself. Each line carries a time, an action, a place, a named owner and, ideally, a fallback. It begins before the first supplier arrives for the build and ends after the last one leaves, covering deliveries, sound checks, staff briefings, doors opening, speeches, catering service and the breakdown of the set.

One version is shared with the whole team and every supplier, and one person, usually the event lead or show caller, holds authority to change it on the day. That rule prevents the common failure in which two people give contradictory instructions and guests notice the confusion. Later changes are noted with the time so that everyone works from the same plan.

Drafting starts weeks before, once the date, venue and format are fixed, and the sheet is revised as speakers, suppliers and catering are confirmed. Planning backwards from the event gives the deadlines that feed it. The riskiest moments, such as the opening minutes, technical changeovers, handovers between speakers and moves between rooms, are rehearsed with their owners the day before.

The fallback column is where the document earns its keep. A late speaker, failed audio, a queue at registration or bad weather each has a pre-agreed response and a person to carry it out. Safety arrangements, first aid and emergency contacts are listed alongside, in line with the event's risk assessment.

Worked example

The formal part of a store opening runs a welcome of 10 minutes, a founder's speech of 15, a tour of 20 and a ribbon cutting with photographs of 15.

  1. Programme length: 10 + 15 + 20 + 15 = 60 minutes

The formal programme fills one hour, so doors are scheduled to open well before it begins to allow for arrivals.

In practice

Broadcast and live events use the same idea under the name running order, counting segments in minutes and seconds so the presenter and crew know exactly what comes next.

Watch out

  • A run sheet is not the planning timeline, which counts down weeks before the day.
  • A sheet with no named owner for a line leaves that moment to chance.