Production budget

Also called shoot budget, production cost estimate

In short

A line-by-line estimate of everything a production costs, from crew and equipment to post-production and a contingency reserve, agreed before the work begins.

  • Intermediate
  • Document
  • Checked

In detail

A production budget lists every cost of making a film, recording or photo shoot, grouped into line items. The groups are much the same on jobs of every size: crew, equipment, locations, talent, post-production, travel and catering, and contingency. The figures change from job to job; the structure barely does.

Producers build the budget from the shot list and the schedule, so it is in effect a priced version of the plan. Crew and performers are paid by the day, each day rate covering a stated number of hours with overtime beyond them. Multiplying rate by days gives each cost line, which is why a single extra shoot day adds a whole new set of crew, equipment and location costs. On small shoots, crew is usually the largest line and post-production the second.

Contingency is a reserve held for things nobody could know when the budget was written: rain, illness, a lost location or a failed drive. It is sized from the job's uncertainty, so an outdoor shoot with children, animals or vehicles carries a larger reserve than a rehearsed studio day. It is not hidden profit, and producers report at the end what it was used for.

Budget and schedule are two views of one plan. If the shots do not fit the booked days, either the budget grows to pay for more time or the shot list shrinks. A budget whose lines do not add up to its total is not finished.

Formula

Total budget = subtotal + contingency

subtotal
the sum of all planned cost lines: crew, equipment, locations, talent, post-production, travel and catering
contingency
the reserve for genuine surprises, often set as a share of the subtotal according to the job's risk

Worked example

Kola Foods, a made-up snack brand, plans a two-day shoot. Crew costs US$9,000, equipment US$3,000, locations and talent US$5,000, post-production US$5,000 and travel and catering US$2,000. The producer sets contingency at 10% of the subtotal.

  1. Subtotal: 9,000 + 3,000 + 5,000 + 5,000 + 2,000 = 24,000
  2. Contingency: 24,000 x 10% = 2,400
  3. Total: 24,000 + 2,400 = 26,400

The agreed budget is US$26,400, of which US$2,400 is held back for surprises.

In practice

Clients usually see a summary with the main groups, while the producer works from a detailed version listing every role, rate and day. The budget is approved before bookings are made, tracked against actual spending during the job and closed with a cost report showing where the money went and what happened to the contingency.

Watch out

  • Contingency is not a fixed percentage to be spent: it rises with risk and is not used for extra shots someone happens to like.
  • A day rate covers set hours only; overtime, travel days and preparation days are separate lines.