Predictive approach

Also called waterfall, waterfall approach, plan-driven approach, predictive life cycle

In short

A way of running a project in which scope, schedule and budget are planned in full before building starts, then delivered in sequence.

  • Intermediate
  • Concept
  • Checked

In detail

In a predictive approach the team defines what will be built, how long it will take and what it will cost before the main work begins. Phases follow each other in order, typically requirements, design, build, test and handover, and each phase finishes before the next starts. The plan becomes a baseline, and changes are controlled against it.

The approach suits work where requirements are clear and stable, where mistakes are expensive to undo, or where contracts and regulation demand a fixed specification: building a bridge, installing a plant, moving offices. Its strengths are predictability, clear contracts and early knowledge of total cost.

Its weakness is late learning. Users may not see the product until near the end, and if the requirements were wrong, the fix comes at the most expensive point. Many organisations now reserve the predictive approach for the stable parts of a project and use adaptive methods where needs are uncertain, combining the two in a hybrid.

In practice

Capital projects in construction, engineering and infrastructure are usually run predictively, with design frozen at a gate before procurement and build.

Watch out

  • Predictive does not mean change is forbidden; it means change is controlled against a baseline.
  • Calling a project agile does not make a fixed-scope, fixed-price contract adaptive.